| Cover Story |
| Columns |
| Commercial |
| Executive Advice |
| Heavy Highway |
| Material/Equipment |
| Residential |
| Schools/Healthcare |
| Specialty Trades |
| Sustainablilty |
| Cornerstone Construction: |
| Profile | |
| By Brooke Knudson | |
| Tuesday, 25 September 2007 | |
![]()
This complex facility will house a majority of the science departments on campus and feature 37 state-of-the-art research labs, faculty office space, a 100-seat auditorium, a 60-seat planetarium, a vivarium and specialized teaching labs for both undergraduate and graduate students. The corridors will connect in the center of the facility under an expansive glass atrium. Valued at $87 million, the science building was funded mostly by appropriations from the Alaska State Legislature and additional funding from federal grants and UAA. The building will serve as a central location for research and education in the biological sciences, chemistry, environmental biology, geology and physics. “We really wanted to design a community for the sciences where the students and faculty would have to interact,” says Martha Hatch, associate professor and former associate dean of the College of Letters and Science. “We wanted to build a real community for the sciences,” Hatch says. “[The project] has come from faculty planning and discussion about where the sciences are going.” Strong enrollment numbers and an increasing awareness of the need to prevent the state’s “brain drain” fueled the need for the new building. Before, the university could only provide a portion of the students with the latest technology and lab facilities, forcing many to look out-of-state for other programs, and eventually, careers. Now, Hatch says, “there is no doubt we will retain more students.” The Anchorage-based company has found its niche constructing complex facilities in Alaska, where the competition cannot. Cornerstone specializes in medical, military, laboratory, educational and industrial projects. Meeting tight deadlines and budgeting requirements while still building a quality facility requires the company to partner with UAA, a team of subcontractors and ZGF Architects. According to Project Manager Mark Palmatier, the design/assist relationship has helped keep all parties aligned with the budget, allowing the company to make immediate adjustments when needed in the initial design phases. For example, when the project exceeded the budget by almost $6 million, within 10 days, the company used value-engineering, pulled out unnecessary mechanical, electrical and plumbing elements and brought the budget back in check. In March, Cornerstone broke ground on the facility, constructing the foundation and erecting the steel and concrete frame. The company had to pay close attention to the seismic zone requirements. To meet the zoning requirements, Cornerstone constructed five groups of pilings made of steel pipe that were each driven 40 feet below the surface and capped off with as much as 160 pounds of concrete and steel plates. “I have never seen anything quite like this – and I have been doing construction for 30 years – with the giant seismic plates of steel that go down so far,” Palmatier says. As if merely constructing a building of this magnitude wasn’t enough of a feat, Cornerstone must also deal with the seasonal, sometimes harsh, Alaskan climate. “Our timeframe is the biggest challenge,” Palmatier says. “We just don’t have enough summer to get things in place. The building is too large. We’ve been working crews as much as [12-hour shifts, seven days a week].” The company plans to have the roof in place by early October, which will allow the team to work inside the structure during the winter months. The location also makes it more challenging for the contractor to meet work force goals. Extensive preplanning and scheduling helped cut the risk of coming up short with its work force. “We put together an organizational chart; the planning up front was enormous, so we assigned duties before we started,” Palmatier explains. Several members of the team have also been assigned to specific tasks, with individuals in charge of document control and construction management. Cornerstone also held an extensive interview session to select the 40-plus subcontractors it will have working on site by the building’s completion. During the interview process, Palmatier says, the company looked closely at the subcontractors’ experience in complex design, cost margins and ability to meet tight deadlines. As he explains, the interviewing process ensures better quality control. |
|
| < Previous Story | Next Story > |
|---|